Events/Kronplatz King

Kronplatz King

MTB
Date
Mon, 30 Aug 2027
Venue
Plan de Corones / Kronplatz, South Tyrol, Italy
Countdown
August
Distance
62km
Total climb
2,700m

Most marathons let you freewheel to the line. This one finishes at the top of Kronplatz, roughly 2,275m up. The finish goes up, not down, decided on a big sustained climb on already shattered legs.

Create a free training plan for the Kronplatz King
7-day free trial, no card required
Create my plan
The course

The route

From the valley the course strings together long sustained climbs and technical alpine descents across the Kronplatz massif, saving the biggest ascent for last: the decisive climb to the roughly 2,275m summit finish.

Weather

Late-August, Plan de Corones / Kronplatz

18°CTypical high
8°CTypical low
-2°CColdest in 20 years
63%Days with rain

Highs around 18°C and lows around 8°C, but it has dropped to -2°C. Rain on 63% of days. Pack for the cold end, not the average.

NASA POWER data, 2006-2025, the week either side of race day
Training

Training for the Kronplatz King

We don't do generic plans. We combine deep knowledge of this race's demands with your recent training, then build a plan with you that progresses as you do.

Beina integrates directly with your existing tools to understand your current fitness, and synchronise your planned sessions.

GarminWahooPolarHammerheadIntervals.icu
A finish that goes up
Typical sessions
Roughly 2,700m of climbing packed into about 62km of Dolomite terrain, near 40m of ascent per kilometre
A summit finish at roughly 2,275m: the decisive effort lands on tired legs at altitude
Exposed, technical high-mountain descents between the climbs, high-consequence when wet
Cool, windy summit and afternoon alpine storm risk to plan and layer for
What your weeks look like
Typical sessions
Climb-at-the-End: a hard 20 to 40min climb at the end of a 3 to 4hr ride, rehearsing the summit finish on tired legs
Long Climb Reps: 1x30 to 50min at roughly 88 to 92% FTP on a real sustained climb
Sweet-spot off-road: 3-4x15 to 20min at 88 to 93% FTP climbing for durability
Big Dolomite days: 4 to 5hr off-road building toward 2,000 to 3,000m of climbing, ending on a hard ascent
Not a generic schedule
Typical sessions
Built from your current fitness and the time you actually have
Adapts every week as Beina learns how you respond
Syncs your sessions straight to Garmin and Wahoo
One clear next session, never a wall of spreadsheet
Entries open now
Get your Kronplatz King plan.
7-day free trial, no card required.
Start my plan